Day 2- Deconstruction

No Comments

So, didn’t take today off, so normal work day (and then some)

After talking with Scott yesterday about the what’s next and when, we decided that we are going to rip out the flooring in the ‘addition’ part of the kitchen.  The floor is not level, there is about an inch, inch and a half difference between walls and it’s not very sturdy…so let’s fix it, starting Wednesday.  I told him that I would be ready

Today’s todo:

The addition list

  • remove the rest of the ‘diner’
  • rip out all the walls down to the studs
  • rip out the ceiling tiles

more to come later, and pictures

Leave a Reply

Your email address will not be published. Required fields are marked *