Day 1- Deconstruction

No Comments

Did an hour or so of Coretel work, even taking a day off, I don’t want to drop anything that really needed to be at least touched…

Had to finish pulling everything out of the cabinets, run the dishwasher one last time and take out the trash/recycling…Jen kicked some ass!!

Scott got here just as we were breaking for lunch, but he went right to work removing the copper and sewer lines from the sink, and pulling the sink out of the countertop. And not to forget about removing the electric line for the stove.

  • All the countertops and cabinets have been removed
  • Most of the 1st and second layer of flooring have been removed
  • Some of the 1st layer of walls have been removed

each of these things had something weird happening that made us all shake our heads:

the base cabinets were sitting on a pre-made, nailed to the floor base, but not secured to each other, so once the countertop was disconnected, these cabinets just pulled right out of their slots

the flooring…this might end up being it’s own blog entry 🙂

1st layer of wall, paneling that just crumbles (makes easy to put it out in the trash), but under it, drywall that does the same thing…down to the studs we go