The nagging list of things to do, before I can start the real list of things to do!

No Comments

I know everyone has one…a list of distractions.  Like needing to go to the market, but having to stop at the post office first, the pet store and probably home depot.

  •     clean out the shed (there are still things in there from the kitchen reno)
  •     get gas for the pressure washer, lawn mower and weedwacker…(wait, I got a new battery operated weedwacker last year…woot!)
  •     2 cycle oil (there’s the home depot trip)
  •     finish cutting down the tree/bush/stump that’s outside my office window
  •     rake up all the pine needles in the back yard (so I dont need to have them removed from the paw pads)
  •     monkey balls…that’s all I am sayin…fucking monkey balls!
  •     oil the grill (twice a year…(food grade) mineral oil on the stainless will prevent rusting)
  •    cut the vines out of the trees near the creek (those damn things are killing all the trees back there)
  •     order the table that goes with the glider

DONT FORGET to put the new registration in the car and the sticker on the plate…and get it inspected

Spring 2014 Wish List

No Comments

I have a pretty big list for this spring/summer, but it’s time to get some estimates on the roof and get that done!

ok, so maybe I should call this the wish list of things I would like to do

starting with the front porch (I would really like to make it a screened in porch) but to make me happy this year, I would like to

replace the front window with a bay window
remove the old steps – replace with cement steps, add a railing
refresh the stucco under the porch
possibly refinish the porch and replace the railings and gate

have kevin (http://www.anthonytreeservice.com/) groom and possibly cut down some of the 6 pine trees that surround the shed

I’m sure there are more things that will get added to the list…one project at a time

kitchen renovation tidbits

No Comments

BULK paperplates, plastic utensils, water bottles

primer+1, all in one paint…just sucks!!  waste of money!

if you get the opportunity to wrap your tub with isolation, do it!  really makes a difference when you lean back

17 cabinets = 41 pulls

when in home depot/lowes and even ikea, use the same credit card

if you cant decide between 2 things, buy them both, you can take everything back after the project is complete, and you wont need your receipt for homedepot/lowes as long as you have the credit card….sure as hell beats going back a second time after every trip

the weight of 200 ceramic tiles can actually test the support of your car…also, people in Lowes don’t care if you cant stop the cart when you are using your full body momentum to move it forward

buy what you know will be happy with even if it cost a few extra bucks…you only want to do this once!

Trim & Baseboards

No Comments

Some of the final touches have been happening this week!  Final coat of sealer is on the countertop!  All the cabinets have been vacuumed and the drawers have been wiped out…meaning all the doors and drawers are now in place.  Some of the food and glassware has been brought back up

Scott finished off the trim and baseboards this morning and started on the toe-kick for the cabinets.  I also received the door sweep and the Up/Down shades, so the door sweep was installed too.

The shades came in too, but preparing the window for these may be a project in itself..maybe tomorrow.

weekend projects

No Comments

Saturday, we went to Lowes in DE to get a new faucet…believe it or not, they had more bronze ones than HomeDepot…and I was still pissed at them anyway!!  We also went to a bunch of furniture places to see if we could find a table that will fit in our ‘bistro’ corner…no luck there!

Sunday, installed the new faucet!  no leaks!  Once that was done, we put the first coat of sealer on the countertop, from what we have read, we are supposed to do this every 6 months to a year…so worth it!

I went internet surfing for some stuff…found a slate bistro table that we are hoping works with the rest of the kitchen, if not, I am SO prepared to spray paint it black and be done with it, I also ordered Up/Down shades on clearance at jcp.com and a door sweep that automatically drops when the door is closed…awesome little device!!  Let’s hope it’s all here by Thanksgiving!

Faucet and plumbing

No Comments

The sink is in place, the dishwasher and garbage disposal all work…one remaining problem, the faucet…the hot water doesn’t turn off

Scott says just take the cartridge to homedepot, they should be able to replace it, no problem. Yeah, right, no problem…they still sell the faucet, but not the cartridge…argh!  I was so fired up in home depot that I wasn’t going to spend another dollar there tonight!

Plumbing

No Comments

Today Scott worked on his own and kicked some ass on the plumbing.  I think he was disappointed with what he didn’t get done…but it wasn’t an easy job.  He had to break through a concrete wall down in the basement to run the sewer pipe in a straight run, install some stop valves further back in the line….besides the electricity, he only needs to connect hot and cold to the sink and install the trap on the second sink (and a vent)

The dishwasher is in place, water supply connected, sewer line connected…garbage disposal in place and connected…all that is needed is electricity….

hopefully that will happen tomorrow…as long as the nor’easter doesn’t dump snow on us…

Grouting the countertop, bullnose and backsplash

No Comments

Today we got this project started…

Unfortunately, I had to make a work trip to Harrisburg and onto Richmond and Norfolk, so we only got the long countertop done.  After wiping away the haze, we are 100% happy with our choices.  There are a few places that we weren’t able to tell if there was enough grout, so my guess is, we will be doing a second/touch up coating…no biggie

Bullnose and Backsplash

No Comments

Just when I thought that Scott wouldn’t make it because it was getting late in the day, he showed up! woot woot!  I was also able to step away from work to help and Jen was able to break away too.  After lining up the backsplash tiles, we started cutting away what we needed for the front and the top…with Scott’s guidance, we got them all in place fairly quick.  I thought for sure that it was getting too late and Scott still had to go to another job, but he decided to go ahead and stay and finish the bullnose.  So he made the corner cuts and Jen and I buttered up each piece to get ready for Scott to put them in place.  There were a few tiny glitches, but for the most part it was painless…and it looks awesome…

next, grout…black grout