Plumbing

No Comments

Today Scott worked on his own and kicked some ass on the plumbing.  I think he was disappointed with what he didn’t get done…but it wasn’t an easy job.  He had to break through a concrete wall down in the basement to run the sewer pipe in a straight run, install some stop valves further back in the line….besides the electricity, he only needs to connect hot and cold to the sink and install the trap on the second sink (and a vent)

The dishwasher is in place, water supply connected, sewer line connected…garbage disposal in place and connected…all that is needed is electricity….

hopefully that will happen tomorrow…as long as the nor’easter doesn’t dump snow on us…

Leave a Reply

Your email address will not be published. Required fields are marked *