Vacation is over

After a fantastic Anniversary weekend at Rocky Gap Resort, it is time to get this project rolling! Scott came over last Thursday and we went over just about everything we want to dig in to. This is the order for getting the porch done…electric, insulation, and then drywall.
The first thing that really needs to be done is the wired doorbell so I can move my office down stairs and not have to run upstairs every time the dogs feel the need to bark (they do this at least 10x’s a day…one barks and the other two start (not even knowing why)) So the idea is to do what needs to be done to get there…
The first thing I need to do is gut the inside front wall so we can put some outlets on the front porch and the ceiling fan