Day 5 and 6 -Deconstruction

No Comments

Yesterday was more of an ‘at work’ day…I kicked some ass on my list of things to do.  Scott brought the wood needed to level the floor and while he was here he introduced me to a couple new tools that I have never used before…my only question IS, why have I never used these tools before??

1st) ‘panel carrier’, now if you have ever tried to carry/move an 8’x4′ piece of wood or drywall, you need to have one of these.  This thing is made to make it easier for 1 person to carry an 8’x4′

2nd) Cat’s Claw is now my preferred tool to the crowbar.  This thing goes deep into wood, paneling, drywall, etc

Last night I spent an hour or so using this tool to removed deeply embedded nails in this 3/4″ wallboard (this is the stuff that used to be on the outside wall, underneath the siding)

Got and early start today…nails, nails , nails…

I have the kitchen ‘addition’ 99% gutted, cleanup and then onto the remaining drywall.

There is very little left to demo…maybe one more day and lots of trash bags later…

Leave a Reply

Your email address will not be published. Required fields are marked *